sales@ergotech.co.uk

Geo Engineering Instrumentation Systems

Dual / Triple Function Whole Core Apparatus

The Product Features -

Fully Enclosed St. Steel Box Section Frame with Lexan (Polycarbonate) and St. Steel Side Panels and Doors.

Double Acting Hydraulic Cable Cylinder for Hydro-pneumatic Controlled Vertical Motion.

Cross Beam is assembled so that Matrix Cup and Permeability Cell can be used simultaneously.

5,000 PSI / 350 BAR Permeability Cell with two Overburden Fluid Options (Water /Oil)

The Whole Core and Cabinet features many Safety Interlocks to protect the user during operation.

Matrix Cup for Porosity and Grain Density  200psi/14bar Helium gas.

Stand Alone Control Console (Compressed Air driven Water/Oil Overburden Pressure Application)

1.    Digital Overburden Pressure Display

2.    Emergency Stop to Isolated Electronics

3.    Overburden Needle Relief Valve

4.    Swagelok and Hoke High Pressure Trunion Ball Valves (5,000 & 6,000 PSI rated)

5.    Independent Vacuum Valves with Vacuum Gauge (Integral Vacuum pump is installed within the console)

6.    System Air Supply and Regulated Air Supply Gauges

7.    Simple Vertical Motion Control

8.    Air Filter/Regulator for increased control Overburden Pressure Control

9.    Pumps can be manually operated to reach target Overburden Pressure. This feature will reduce the Chance of over shooting (Especially important when testing unconsolidated samples).

To download a PDF datasheet click the link below

Dual Function Whole Core

Triple Function Whole Core